FacMgmt: DL 104 - Center for Excellence in Teaching & Learning

100%

Status

Completed - Met Expectations [Completed - Met Expectations]

100% complete, updated on Thu 9/23/21 9:12 PM by Zachary Pahl

Changed Status from In Process to Completed - Met Expectations.
Project was completed in time for the CETL opening events in late August 2021

Details

Dates
Tue 4/14/20 - Thu 9/23/21
Acct/Dept
Facilities Management
Type
Project / Construction
Health
Green - On track
Created
Tue 4/14/20 1:18 PM
Modified
Thu 9/23/21 9:12 PM
Closed
Thu 9/23/21 9:12 PM

Description

The Center for Excellence in Teaching and Learning (CETL) has been assigned room 104 Davee Library, backfilling space vacated by the Academic Success Center. The space needs to support the following functions:
1) Meeting space in a classroom type configuration for 24 people.
2) Two active learning style table settings.
3) A small semi-private office workstation.
4) Bookcase for storing written materials.
The space does not require any major alterations. One of the two room doors should be equipped with a card access type lockset for ease of allowing entrance to university faculty and instructional academic staff. The existing tile floors are adequate, as is the general room lighting.

Manager

Alternate Manager(s)

Stakeholders (7)

AS
Alan Symicek
Accountable, Consulted, Informed
UWRF Facilities Director
Tue 4/14/20 10:59 PM
CK
Cyndi Kernahan
Accountable, Consulted, Informed
UWRF CETL Director
Tue 4/14/20 10:59 PM
DB
Dale Braun
Accountable, Consulted, Informed
UWRF Campus Planner
Tue 4/14/20 10:59 PM
GC
Grace Coggio
Informed
UWRF CETL Sustainability Fellow
Fri 4/17/20 11:13 PM
Joseph Kmiech
Joseph Kmiech
Accountable, Consulted, Informed
UWRF DoTS CIO, Director
Tue 4/14/20 11:01 PM
MM
Michael Mueller
Responsible, Accountable, Consulted, Informed
UWRF Facilities
Tue 4/14/20 10:58 PM
NB
Nathan Beeman
Responsible, Accountable, Consulted, Informed
UWRF Facilities
Tue 4/14/20 10:58 PM